Collections:
Other Resources:
DOI: 10.1016/j.autcon.2019.102993
Paper Summary:
Title: Imprecise earned duration model for time evaluation of construction projects with risk considerations
Author(s): Hamzeh, Amir Mohammad ;Mousavi, Seyed Meysam ;Gitinavard, Hossein
Year: 2020
DOI: 10.1016/j.autcon.2019.102993
URL: https://doi.org/10.1016/j.autcon.2019.102993
Received on: 2024-06-11
✍: FYIcenter.com
2024-06-18, ∼432👍, 0💬
Popular Posts:
Paper Summary: Title: Disturbo borderline di personalità e autolesività in adolescenza Author(s): di...
Paper Summary: DOI: 10.1038/d41586-024-00061 -4Received on: 2024-04-04
Paper Summary: Title: Design, fabrication and control of origami robots Author(s): Rus, Daniela; Tol...
Paper Summary: DOI: 10.1515/ijnsns-2020-0288 Received on: 2024-03-27
Paper Summary: DOI: 10.4103/ijt.ijt_189_20 Received on: 2024-04-12