Collections:
Other Resources:
DOI: 10.1108/JEDT-07-2018-0119
Paper Summary:
Title: Integrated cost, quality, risk and schedule control through earned value management (EVM)
Author(s): Khesal, Tahereh; Saghaei, Abbas; Khalilzadeh, Mohammad; Rahiminezhad Galankashi, Masoud; Soltani, Roya
Year: 2019
DOI: 10.1108/JEDT-07-2018-0119
URL: https://doi.org/10.1108/JEDT-07-2018-0119
Received on: 2024-05-19
✍: FYIcenter.com
2024-05-22, ∼554👍, 0💬
Popular Posts:
Paper Summary: Title: Pinecone or date palm male inflorescence – metaphorical pollination in Assyria...
Paper Summary: Title: Substantial Change: Continuous, Consistent, Objective Author(s): Maitzen, Step...
Paper Summary: DOI: 10.13140/RG.2.2.11857.68 965Received on: 2024-03-25
Paper Summary: DOI: 10.1016/j.ecresq.2023.09 .004Received on: 2024-11-12
Paper Summary: Title: High Altitude || Human Evolution at High Altitude Author(s): Swenson, Erik R.;...