Collections:
Other Resources:
DOI: 10.1061/(ASCE)0733-9364(1997)123:4(450)
Paper Summary:
Title: Scheduling/Cost Optimization and Neural Dynamics Model for Construction
Author(s): Adeli, Hojjat; Karim, Asim
Year: 1997
DOI: 10.1061/(ASCE)0733-9364(1997)123:4(450)
URL: https://doi.org/10.1061/(ASCE)0733-9364(1997)123:4(450)
Download Paper from Sci-Hub:
Received on: 2024-05-19
✍: FYIcenter.com
2024-05-22, ∼796👍, 0💬
Popular Posts:
Paper Summary: Title: Integrating technical-environmental- economicalperspectives for optimizing rub...
Paper Summary: Title: [2022 IEEE 10th Asia-Pacific Conference on Antennas and Propagation (APCAP)(Xi...
Paper Summary: Title: Are structured products ‘fairly’ priced? An analysis of the German market for ...
Paper Summary: Title: Ghid pentru elaborarea lucrarilor de licenta si masterat in domeniul contabili...
Paper Summary: Title: Towards Transformative Soil Science: Who am I in relation to my research? Auth...